Strengthen the explosion-proof bottom line for gas fields in mountainous areas! The 1,000–5,000 m³ natural gas refrigeration unit with a fully explosion-proof structure has been implemented at a mountainous well site in Sichuan.

I. Project Background

Oil and gas wells in the mountainous areas of Sichuan are mostly distributed in high-mountain field locations and belong to flammable and explosive hazardous areas. Conventional natural gas drying equipment generally has simplified explosion-proof configuration hazards: insufficient control cabinet wall thickness, non-compliant gaps, wiring using raw material tape instead of explosion-proof cable glands, ordinary terminals without explosion-proof qualification, non-explosion-proof electric heat tracing, and other problems, which can easily cause flammable gas leakage and explosion risks. This project is a customized 1000-5000Nm³/day skid-mounted explosion-proof natural gas chiller (natural gas refrigerated dryer / drying device) for a single well in the mountainous area of southern Sichuan. The core requirements are intrinsically explosion-proof for the entire unit, full-process compliance, and elimination of electrical safety hazards.

II. Pain Points of Existing On-Site Equipment

The wall thickness and cavity gaps of traditional equipment explosion-proof control cabinets do not meet standards, and explosion-proof pressure relief and flameproof performance are lacking;

Pipeline electrical wiring is only wrapped with raw material tape for sealing, without explosion-proof cable glands. After temperature differences in the field, the seal fails and gas seeps into the cabinet;

The compressor anti-freeze half-heating tape and junction box have no 3C explosion-proof certification. When icing occurs under low-temperature conditions, the electric heat tracing is prone to sparking;

Ordinary terminals and ordinary emergency stop buttons have no explosion-proof rating, and there is an ignition risk after misoperation or gas intrusion;

The control cabinet is frequently opened for maintenance without double-layer isolation protection, and non-professional operation can easily allow miscellaneous gas to enter the cavity.

III. Core Configuration of the Customized Explosion-Proof Solution

Flameproof Explosion-Proof Control Cabinet with Double-Layer Protection

The cabinet strictly controls wall thickness and cavity flameproof gaps, undergoes factory sealing acceptance, and is designed without frequent opening structures unless necessary to reduce flammable gas intrusion paths; the internal independent partitioned maintenance door separates contactors and wiring by zone, isolating the explosion-proof cavity during maintenance and reducing operational risks. All dedicated explosion-proof terminals are used inside the cabinet to eliminate the hidden danger of electric sparks from ordinary wiring terminals.

Standardized Wiring with Explosion-Proof Cable Glands for the Entire Circuit

All electrical outgoing lines of the entire unit are uniformly equipped with explosion-proof cable glands. The raw material tape sealing solution explicitly prohibited by the industry is completely abandoned. The multi-layer sealing structure adapts to the day-night temperature differences and high-humidity environment in mountainous areas, does not leak or admit air during long-term use, and fundamentally blocks natural gas at the well site from seeping into the electrical cavity.

Full Set of 3C Explosion-Proof Anti-Freeze Accessories

The compressor is matched with explosion-proof half-heating tape based on accurate load calculation and equipped with a junction box with 3C explosion-proof certification, monitoring the evaporation temperature in real time to avoid freezing damage to the unit under low-temperature conditions. The electric heat tracing system fully complies with explosion-proof specifications for hazardous areas.

Explosion-Proof Safety Accessory Components

The entire unit is equipped with an explosion-proof emergency stop button for emergency shutdown in response to on-site misoperation or sudden working conditions; fan contactors are arranged in independent compartments, using first-tier brand explosion-proof components. The separated layout facilitates later maintenance without damaging the integrity of the explosion-proof cavity.

Mechanical Explosion-Proof Protection for the Entire Unit

A safety protection mesh that fingers cannot reach through is installed on the outer side of the condenser to block accumulation of mountain leaves and weeds from obstructing heat dissipation, while also preventing personnel from accidentally touching the fan; inlet and outlet pipelines are arranged in parallel, abandoning the vertical structure, to prevent debris from falling into the heat exchanger shell during installation and to prevent internal pipeline wear and leakage.

IV. Project Implementation Results

Since the equipment was put into operation, there have been no electrical sealing or explosion-proof cavity gas leakage problems under the high-gas environment in the mountainous area; the explosion-proof half-heating tape stably controls the evaporation temperature, and the compressor has no icing failures; the maintenance process for the double-layer isolated control cabinet is standardized, eliminating safety hazards caused by unauthorized opening, and the project has successfully passed the special explosion-proof acceptance for oil and gas fields, becoming a standard model for explosion-proof equipment at well sites in the area.

FAQ

Multi-stage skid-mounted combined process. Mechanical separation removes free liquid droplets and solid impurities to protect downstream equipment; condensation dehydration completes preliminary water vapor precipitation; adsorption drying achieves deep dehydration, with outlet gas dew point reaching -40℃~-76℃, meeting the requirements for CNG, LNG, pipeline transmission, and wellhead gas drying; intelligent regeneration automatically switches between adsorption and regeneration, with closed-loop gas reuse to reduce losses. For ordinary pipeline transmission, a condensation-based solution can be selected; for scenarios with high dew point requirements such as CNG filling stations, LNG front-end, and shale gas, the full process is recommended, and it can be customized according to gas volume, pressure, and inlet water content.
Under the premise that the gas source is free of oil and liquid contamination, the service life of the molecular sieve is about 3-5 years. Failure of the outlet dew point to meet the standard and a significant increase in system pressure drop are signals that maintenance and replacement are needed. The equipment is equipped with a dedicated filling port, so replacement does not require extensive disassembly of piping. The whole unit operates fully automatically and supports unattended operation; daily work only requires inspection of dew point, pressure, and blowdown status. The main wear parts are filter elements and molecular sieve.
Closed-loop regeneration, using dried product gas for regeneration, wet gas is recovered into the system, natural gas loss is less than 0.5%. Energy consumption mainly comes from electric heaters and cooling fans. Compared with triethylene glycol dehydration, no chemical procurement and waste liquid treatment are required, no chemical leakage, small skid footprint, simple operation, more suitable for gas stations, small and medium-sized gas fields, and coalbed methane scenarios; corresponding solutions are also available for large processing capacity conditions.
The equipment can be used outdoors in skid-mounted configuration. In cold regions, explosion-proof electric heat tracing and pipeline antifreeze insulation are configured to avoid ice blockage. It is recommended to provide a simple rainproof and thermal insulation shelter to extend equipment life. Minimize liquid water and oil mist in the inlet gas; for high water content gas sources, strengthen the pre-separation unit; when the gas source contains high hydrogen sulfide and heavy hydrocarbons, a gas composition report is required for targeted process adjustments.
Standard PLC touch screen, reserved communication interface, can connect to customer's existing control system, optional cloud platform for remote viewing of operating parameters, fault alarms, and adjustment of regeneration parameters. The whole machine has a warranty of 12 months from the date of qualified commissioning; vulnerable parts such as filter elements and molecular sieves are warranted as accessories; during the warranty period, non-human damage will be repaired with free replacement parts. Nationwide after-sales service, 24-hour technical response, 48-hour on-site service if necessary, lifetime technical support and spare parts supply after the warranty period, and on-site maintenance and personnel training services are available.