Natural Gas Dehydration and Hydrocarbon Removal Unit

Get a Quick Quote >

60,000 m³ oilfield associated gas dehydration and hydrocarbon removal unit Overview

Yipu low-pressure oilfield associated gas dehydration and dehydrocarbonization skid-mounted unit,custom-developed specifically for Kazakhstan low-pressure 0.2‑0.3MPa oilfield associated gas,integrated skid-mounted design for the entire unit,adaptable to -39°C extreme cold field conditions.The unit adopts mechanical compression refrigeration process,combined with a molecular sieve adsorption system,enabling deep dehydration and dehydrocarbonization of natural gas,effectively preventing low-temperature hydrate freezing blockage;adopts isobaric semi-open zero-emission regeneration process,with internal circulation of regeneration gas,Reduces natural gas loss and VOCs emissions.The equipment is equipped with an explosion-proof PLC automatic control system,supports remote monitoring and remote start/stop,The molecular sieve tower is provided with a dedicated loading/unloading port,convenient maintenance.The equipment completes full factory acceptance testing before delivery,skid-mounted integration greatly reduces on-site installation workload,enabling simultaneous recovery of mixed hydrocarbons,improving the utilization rate of associated gas resources,meeting the safety requirements of field well sites in Central Asian oilfields,environmental protection,efficient operation requirements.

Professional 60,000 m³ oilfield associated gas dehydration and hydrocarbon removal unit Company

17+
years of professional field experience
6+
product R&D experience
9+
intellectual property
20+
industry application cases

Deeply engaged in customized solutions for the natural gas dehydration industry

Industry Pain Points

Insufficient dehydration depth, low-temperature systems are prone to freezing blockage and corrosion
Insufficient dehydration depth, low-temperature systems are prone to freezing blockage and corrosion
The water dew point of traditional triethylene glycol and simple condensation processes can only reach -20~-40℃, which cannot meet the deep dehydration requirements prior to low-temperature dehydrocarbonization; saturated water in associated gas is not completely removed, and hydrates are easily formed during refrigeration and transmission, causing freezing and blockage of pipelines and evaporators, leading to equipment corrosion and unplanned shutdowns, with a heavy workload for on-site unblocking and maintenance.
High regeneration loss, resource waste, high environmental pressure
High regeneration loss, resource waste, high environmental pressure
Conventional molecular sieve dehydration mostly uses open-loop regeneration, with large amounts of finished natural gas directly vented, flared, or emitted, which not only causes loss of natural gas resources but also brings VOCs emissions; on-site venting and ignition pose safety hazards, and operational economy is poor.
Poor adaptability to low-pressure conditions, dehydration and dehydrocarbonization systems are separated
Poor adaptability to low-pressure conditions, dehydration and dehydrocarbonization systems are separated
The pressure of low-pressure associated gas is only 0.2-0.3MPa; J-T throttling refrigeration relies on pressure energy, and sufficient low temperature cannot be achieved under low-pressure conditions; most equipment on the market uses two independent units for dehydration and dehydrocarbonization, resulting in long processes, numerous equipment items, large footprint, high investment cost, and low skid-mounted integration, making it unsuitable for relocation and use at oilfield well sites.
Low degree of automation, complex operation and maintenance, short molecular sieve life
Low degree of automation, complex operation and maintenance, short molecular sieve life
Traditional equipment requires much manual operation, with valve switching and regeneration processes relying on manual labor; gas flow impact causes molecular sieve breakage and pulverization, requiring frequent replacement of adsorbent; lack of complete protection interlock, heater prone to dry burning, motor overload damage, high technical skill requirements for on-site operators, and difficult operation and maintenance in remote oilfields.

Solutions

Aiming at the pain points of water content and excessive heavy hydrocarbons in low-pressure associated gas in oilfields, adopts an integrated skid-mounted solution of pre-separation + molecular sieve dual-tower adsorption dehydration + refrigeration and freezing heavy hydrocarbon removal + isobaric semi-open zero-emission regeneration
SolutionsKey points
Multi-stage pretreatment protects the adsorption unitAdopts collision + centrifugal + wire mesh demisting three-stage separation to remove free water, condensate, and solid impurities; utilizes cold energy after dehydrocarbonization to pre-cool inlet gas, energy recovery, reducing refrigeration unit load and protecting molecular sieve.
Dual-tower molecular sieve deep dehydrationDual towers alternating operation ensure continuous gas supply; outlet gas dew point ≤-60°C, avoiding hydrate freezing blockage; flat-cloth diffusion inlet reduces molecular sieve scouring and pulverization; equipped with its own loading/unloading port, no need to disassemble pipelines to replace molecular sieve.
Isobaric semi-open countercurrent regenerationRegeneration pressure equal to working pressure; a small amount of dry gas is pressurized and heated for reverse desorption of water vapor; the regeneration gas system circulates internally, with no product gas venting, saving resources and reducing environmental risks.
refrigeration condensation dehydrocarbonizationAfter dehydration, natural gas is frozen to -10°C, and heavy hydrocarbons are condensed and liquefied; three-stage gas-liquid separator recovers mixed hydrocarbons; evaporator hole-pulling process solves low-temperature leakage and vibration wear; refrigeration system has complete high/low pressure and overload protection.
fully automatic explosion-proof controlPLC + touch screen for fully automatic full-process operation; triple over-temperature, motor overload, and pressure interlock protection; supports Modbus-RTU and remote start/stop; electrical explosion-proof dⅡBT4; whole-machine skid-mounted at factory, on-site only connect pipe openings and power supply.
full life cycle technical supportFactory whole-machine testing; provides installation and commissioning, free training for operators; fault solution within 12h, personnel on site within 24h; 3-year spare parts price lock; provides drawings, fault diagnosis, and inspection suggestions, suitable for remote well sites.

Core Advantages

Strong adaptability to low-pressure working conditions

Custom developed for 0.2-0.3MPa low-pressure associated gas, does not rely on gas throttling pressure energy for refrigeration, solves the problem that J-T valves cannot achieve low temperatures with low-pressure gas sources, especially suitable for small and medium-sized oilfields and distributed well site associated gas resource utilization projects.

Strong adaptability to low-pressure working conditions

Deep dehydration, eliminating low-temperature freezing and blockage

Molecular sieve adsorption dehydration ensures the outlet gas water dew point ≤-60℃, far superior to the TEG process; upstream multi-stage filtration and pre-separation completely eliminate hydrate freezing and blockage hazards in the refrigeration unit, ensuring long-term stable operation of the dehydrocarbonization system.

Deep dehydration, eliminating low-temperature freezing and blockage

isobaric semi-open zero-emission regeneration

Reduce losses and environmental risks, internal circulation of regeneration gas, finished natural gas is not vented to the atmosphere, reduce gas loss, eliminate on-site venting safety hazards, and meet environmental VOC control requirements.

isobaric semi-open zero-emission regeneration

Skid-mounted integrated design, easy installation

Long adsorbent service life,Complete integrated single skid for dehydration + dehydrocarbonation,Uniform diffusion air intake in the adsorption tower,Reduce airflow impact;Equipped with a dedicated molecular sieve loading/unloading port,Molecular sieve can be replaced without disassembling piping;Fully automatic operation,Reduce manual operations,improving interlock protection,Reduce the probability of unplanned downtime.

Skid-mounted integrated design, easy installation

Technical Principle

The entire unit is divided into five major units: pre-cooling pretreatment unit, molecular sieve adsorption dehydration unit, regeneration cycle unit, freezing heavy hydrocarbon removal unit, and instrumentation interlock unit.

Principle of Pre-cooling Pretreatment

Oilfield associated gas (≤40℃, 0.2-0.3MPa) enters the separation filter to remove solid impurities and free oil and water; using -10℃ cold dry gas after refrigeration dehydrocarbonation, heat exchange is performed in the pre-heat exchanger to cool the inlet gas down to 20-30℃, partially saturated water condenses and separates out and is discharged from the gas-liquid separator, completing initial dehydration and reducing the molecular sieve processing load.

Principle of Pre-cooling Pretreatment

Molecular sieve adsorption dehydration principle

Porous crystalline molecular sieve material can selectively adsorb water molecules; under low-temperature conditions, the feed gas passes through the molecular sieve bed, and the water vapor within the gas is adsorbed by the molecular sieve channels, achieving deep dehydration; after dehydration, the gas passes through a dust filter to remove molecular sieve dust and impurities, yielding dry natural gas with a dew point ≤-60℃, which is then sent to the dehydrocarbonation unit. Dual-tower alternating operation: Tower A adsorbs while Tower B performs the regeneration process, ensuring uninterrupted continuous gas supply.

Molecular sieve adsorption dehydration principle

isobaric semi-open countercurrent regeneration principle

After the molecular sieve becomes saturated with water, it needs regeneration to restore its adsorption capacity; a small amount of dry gas is taken from inside the system, pressurized by a booster, heated to about 180°C by an explosion-proof electric heater, and introduced in reverse flow into the saturated adsorption tower, where water molecules desorb from the molecular sieve under high temperature; the regeneration gas carrying a large amount of water vapor enters the cooler for temperature reduction, and the water vapor condenses into liquid water, which is drained through the gas-liquid separator; the separated gas returns to the internal circulation of the process system; the pressure during the entire regeneration process is basically the same as the working pressure, with no product gas discharged to the outside, achieving zero venting loss.

isobaric semi-open countercurrent regeneration principle

Based on the boiling point differences of different hydrocarbon components, a compression refrigeration cycle is adopted. The evaporator of the refrigeration unit cools the deeply dehydrated natural gas to -10°C, and heavy hydrocarbons such as high-boiling-point propane, butane, and pentane condense into liquid; natural gas enters the three-stage gas-liquid separator, where liquid mixed hydrocarbons are separated and recovered, and the gas phase is the purified export natural gas. In the refrigeration cycle, the refrigerant undergoes compression-condensation-throttling-evaporation cycles, continuously providing cooling capacity.

Technical Strength

Standard design and manufacturing

Standard design and manufacturing

The unit is designed, manufactured, and inspected strictly in accordance with SY/T 0076-2023 "Design Specification for Natural Gas Dehydration", GB150-2024 "Pressure Vessels", and TSG 21-2016 "Supervision Regulation on Safety Technology for Stationary Pressure Vessels". All pressure vessels are certified, and complete unit testing and inspection are performed before delivery.
Skid-mounted complete set design capability

Skid-mounted complete set design capability

Can complete the integrated package of process systems, pressure vessels, refrigeration systems, and explosion-proof instruments and controls; the evaporator adopts the punched-hole welding process to solve the pain points of vibration and leakage in low-temperature heat exchange equipment; the three-stage composite separation structure achieves 99% liquid hydrocarbon droplet separation. Key electrical components use Siemens, Schneider, Changhui and other mainstream brands to ensure system stability.
Complete technical service system

Complete technical service system

Warranty period is 18 months from shipment; non-wear parts are repaired free of charge within the warranty period; provide a solution within 12 hours of receiving on-site fault information, and arrive on site within 24 hours; stable supply of spare parts throughout the equipment operation cycle, with a commitment to stable spare parts prices for three years; provide equipment outline, foundation, and electrical drawings within 10 days after the contract takes effect; before delivery, customers may be invited to participate in final assembly supervision; free training is provided for operators; on-site commissioning technicians provide on-site guidance; after-sales service completion requires customer sign-off and acceptance.
Adapt to the digitalization needs of oilfields

Adapt to the digitalization needs of oilfields

The PLC control system reserves a Modbus-RTU communication interface and a passive pulse remote start/stop interface, can connect to the oilfield host computer SCADA system, and uploads temperature, pressure, equipment operating status, and alarm signals, meeting the intelligent construction needs of oil and gas fields.

Process Flow

① Pre-cooling process
Natural gas enters the pre-heat exchanger through the separation filter and is cooled to 20–30°C. The condensed water is discharged from the system through the gas-liquid separator, achieving the purpose of initial dehydration of natural gas and reducing the specifications and dehydration load of the subsequent adsorption towers.

② Drying process
The pre-cooled natural gas enters Tower A. When the gas passes through the molecular sieve bed in Tower A, the molecular sieve adsorbs the moisture in the natural gas under low temperature and high pressure. The dried gas after adsorption undergoes deep purification treatment through the dust filter and reaches the gas outlet, thereby completing the adsorption drying process.

③ Regeneration process
After the molecular sieve is saturated with water absorption, it desorbs the moisture at high temperature. Through valve switching, it enters the regeneration process. The red lines in the flow diagram form a semi-open regeneration circulation system. A small amount of natural gas in the system is pressurized by the booster and enters the heater. After the natural gas is fully heated to about 180°C, it enters the regeneration tower to desorb moisture from the molecular sieve. The high-moisture natural gas after desorption enters the cooler for cooling and separation. The moisture is discharged to the liquid storage tank, and the separated natural gas enters the adsorption tower until the molecular sieve in the tower is fully regenerated. The adsorption and regeneration of Towers A and B are performed alternately.

④ Dehydrocarbonization process
The dehydrocarbonization process adopts the condensation separation method for light hydrocarbon separation. The principle of the condensation separation method is to utilize the different boiling points of the hydrocarbon components in natural gas to cool the natural gas to a certain temperature so that hydrocarbons with higher boiling points are condensed and separated from the gas-liquid phase, thereby obtaining natural gas condensate rich in heavier hydrocarbons. The condensate can be fractionated into qualified products for recovery. This method has a high light hydrocarbon recovery rate.

Natural gas dehydrocarbonization flow diagram
The refrigerator is mainly composed of a low-temperature refrigeration compressor, heat exchanger, condenser, expansion valve, evaporator, gas-liquid separator and other equipment. The specific dehydrocarbonization process is as follows:
(1) The -10°C natural gas cooled by deep cooling exchanges heat with the high-temperature inlet natural gas in the pre-heat exchanger, reducing the inlet gas temperature to 20–30°C for initial dehydration.
(2) The natural gas dehydrated by the adsorption tower exchanges heat with the refrigerant in the evaporator to achieve deep cooling, reducing its temperature to -10 to -15°C, causing part of the light hydrocarbons to condense and liquefy. Finally, gas and condensate are separated through the gas-liquid separator, thereby achieving the purpose of removing part of the light hydrocarbons from the natural gas;
(2) In the compression refrigeration system, the compressor compresses the low-pressure saturated refrigerant vapor from the evaporator into high-temperature, high-pressure superheated vapor, which then enters the condenser. Water or air is used as the cooling medium to condense it into a high-pressure saturated liquid, which then passes through the throttle valve and becomes a low-pressure liquid (with part of the liquid also vaporizing), correspondingly reducing its evaporation temperature. It then enters the evaporator to evaporate and absorb heat, thereby cooling the natural gas. The low-pressure saturated refrigerant vapor after heat absorption returns to the compressor inlet for the next cycle.
⑤ Nozzle description
Gas inlet/outlet: flange WN100(B)-16RF welded flange.
Drain outlet: flange WN15(A)-16RF welded flange.
Vent outlet: flange WN32(A)-16RF welded flange, routed to high-altitude venting or to the flare for discharge.

Product Parameters

Working mediumNatural gas
Working pressure0.2–0.3 MPa
Design pressure0.6 MPa
Dehydration methodMolecular sieve adsorption dehydration
Rated flow rate2500 Nm³/h
Inlet gas temperature≤40°C
Ambient temperature-39–47°C
Inlet gas water contentSaturated water content at 40°C
Outlet gas dew point≤-60°C
Outlet gas temperature (at evaporator outlet)≤-10°C
Pressure drop across inlet and outlet≤0.08 MPa
Regeneration methodIsobaric semi-open countercurrent heating regeneration, zero emissions
Regeneration pressureApproximately the equipment working pressure (isobaric regeneration)
Cooling methodAir cooling
Working modeDual-tower alternating, continuous operation
Control modePLC automatic control (automatic switching, automatic regeneration)
Explosion-proof electric heaterAC380V 86 KW dⅡBT4
Booster compressorAC380V 11 KW dⅡBT4
Cooling fan motorAC380V 1.5 KW dⅡBT4
Regeneration working cycle8 h (adjustable from 8 to 10)
Regeneration time≤7 h (adjustable)
Chiller unitAC380V 45 KW dⅡBT4
Blowdown methodAutomatic blowdown
Structural formIntegral skid-mounted
Inlet/outlet pipe diameterFlange WN100(B)-16RF
Overall dimensions (L×W×H)11000×2800×3100 (mm)
Total equipment mass~14000 kg
Total power consumption≤183 kW

Office Environment

1
1
2
3
4
5
6
7
8
9
10
11
12
14
16
17
18
19
20
1

Partner Clients

Some Customers

1
1
2
2
3
3
4
4
5
5
6
6
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
7
7
8
8
9
9
10
10
11
11
12
12

FAQ

It is specially designed for 0.2-0.3MPa low-pressure oilfield associated gas. Targeting associated gas at oilfield well sites, it can treat gas sources containing free water and excessive heavy hydrocarbon components, and can achieve purification without the need for a high-pressure gas source.
The equipment is specially designed for low temperatures. The skid-mounted body, piping, and electrical controls are all adapted to -39°C extreme cold working conditions, and are equipped with anti-freezing and anti-blocking processes, which can ensure long-term continuous operation in the field in winter.
It adopts internal circulation regeneration with basically no direct venting, reducing natural gas loss and VOCs emissions. Compared with traditional regeneration processes, it is more suitable for the environmental protection requirements of overseas projects.
It is equipped with an explosion-proof PLC fully automatic control system, enabling remote monitoring and remote start/stop; daily operation is mainly automatic, and operation is simple, reducing the manpower pressure for well site operation and maintenance.
The whole machine is delivered as an integrated skid, and on site only pipeline connection and power supply are required; the molecular sieve tower is provided with dedicated loading and unloading ports, making disassembly, assembly, and maintenance convenient and greatly shortening maintenance time.

Send Inquiry