Skid-mounted dehydration and dehydrocarbonization unit for natural gas and oilfield associated gas, developed for 0.2-0.3MPa low-pressure oilfield associated gas, with a rated processing gas capacity of 2500Nm³/h, fully integrated skid-mounted design, integrating pre-separation, molecular sieve deep dehydration, refrigeration condensation dehydrocarbonization, automatic regeneration and control system.
The raw associated gas is first filtered and pre-separated to remove free water and solid impurities; it is pre-cooled to 20-30℃ in the pre-heater for initial dehydration; it enters the dual-tower molecular sieve adsorption system for deep dehydration, with outlet gas dew point ≤-60℃; the dried natural gas enters the refrigeration unit and is cooled to -10℃, and mixed hydrocarbons are recovered through three-stage gas-liquid separation; the entire unit achieves continuous gas supply and fully automatic operation.
The unit adopts Siemens SMART-200 PLC automatic control and is equipped with complete temperature, pressure and overload interlock protection; skid-mounted structure, with equipment, piping and wiring all integrated into the skid, requiring only connection of process nozzles and power supply on site, greatly shortening the installation and commissioning cycle; it can adapt to a wide range of field environments from -39℃ to 47℃ and meets the explosion-proof requirements of oilfields (ExdⅡBT4), outputting qualified dry gas for export while recovering mixed hydrocarbon products, realizing resource utilization of associated gas.
Core Design Indicators
| Project | Parameters |
|---|---|
| Processing Scale | 500~20000Nm³/h |
| Working pressure | 0. 2‑0. 3MPa, Design pressure 0. 6MPa |
| Dew Point after Dehydration | ≤‑60℃ |
| Evaporator outlet temperature | ≤‑10℃ |
| Total power consumption | ≤185kW |
| Regeneration method | zero emission |