Yipu Natural Gas Dehydration and Filtration System Cooperation Case with PetroChina Huabei Oilfield

Project Background:

A certain gas gathering station of PetroChina Huabei Oilfield faced issues such as high water content in natural gas (saturated state) and excessive solid particle impurities, which affected downstream pipeline transportation and the operational safety of compressor units. Yipu developed a customized intelligent dehydration and filtration integrated solution for it.

Technical Solution Highlights:

Three-stage treatment process:

Cyclone separation → High-efficiency coalescing filtration → Molecular sieve deep dehydration

Integrated AI control system automatically adjusts treatment parameters

Key Performance Indicators:

Processing capacity: 200,000 cubic meters/day

Outlet water dew point: ≤-40℃ (original working condition -15℃)

Solid particle filtration accuracy: 0.1μm

Pressure loss control: <0.05MPa

Implementation Results:

Dehydration efficiency increased by 300%, reducing annual pipeline corrosion maintenance costs by 2.8 million yuan

Filtration system service life extended to 5 years (original equipment replaced every 2 years)

Unattended remote monitoring achieved, reducing manual inspection frequency by 80%

Industry Demonstration Value:

This case has become a benchmark project in PetroChina's "Smart Gas Field" construction and has subsequently been replicated and promoted at 6 gas gathering stations in Huabei Oilfield. Yipu's original modular design of "dehydration-filtration-intelligent monitoring" has now become a new industry benchmark.

FAQ

Multi-stage skid-mounted combined process. Mechanical separation removes free liquid droplets and solid impurities to protect downstream equipment; condensation dehydration completes preliminary water vapor precipitation; adsorption drying achieves deep dehydration, with outlet gas dew point reaching -40℃~-76℃, meeting the requirements for CNG, LNG, pipeline transmission, and wellhead gas drying; intelligent regeneration automatically switches between adsorption and regeneration, with closed-loop gas reuse to reduce losses. For ordinary pipeline transmission, a condensation-based solution can be selected; for scenarios with high dew point requirements such as CNG filling stations, LNG front-end, and shale gas, the full process is recommended, and it can be customized according to gas volume, pressure, and inlet water content.
Under the premise that the gas source is free of oil and liquid contamination, the service life of the molecular sieve is about 3-5 years. Failure of the outlet dew point to meet the standard and a significant increase in system pressure drop are signals that maintenance and replacement are needed. The equipment is equipped with a dedicated filling port, so replacement does not require extensive disassembly of piping. The whole unit operates fully automatically and supports unattended operation; daily work only requires inspection of dew point, pressure, and blowdown status. The main wear parts are filter elements and molecular sieve.
Closed-loop regeneration, using dried product gas for regeneration, wet gas is recovered into the system, natural gas loss is less than 0.5%. Energy consumption mainly comes from electric heaters and cooling fans. Compared with triethylene glycol dehydration, no chemical procurement and waste liquid treatment are required, no chemical leakage, small skid footprint, simple operation, more suitable for gas stations, small and medium-sized gas fields, and coalbed methane scenarios; corresponding solutions are also available for large processing capacity conditions.
The equipment can be used outdoors in skid-mounted configuration. In cold regions, explosion-proof electric heat tracing and pipeline antifreeze insulation are configured to avoid ice blockage. It is recommended to provide a simple rainproof and thermal insulation shelter to extend equipment life. Minimize liquid water and oil mist in the inlet gas; for high water content gas sources, strengthen the pre-separation unit; when the gas source contains high hydrogen sulfide and heavy hydrocarbons, a gas composition report is required for targeted process adjustments.
Standard PLC touch screen, reserved communication interface, can connect to customer's existing control system, optional cloud platform for remote viewing of operating parameters, fault alarms, and adjustment of regeneration parameters. The whole machine has a warranty of 12 months from the date of qualified commissioning; vulnerable parts such as filter elements and molecular sieves are warranted as accessories; during the warranty period, non-human damage will be repaired with free replacement parts. Nationwide after-sales service, 24-hour technical response, 48-hour on-site service if necessary, lifetime technical support and spare parts supply after the warranty period, and on-site maintenance and personnel training services are available.