Natural Gas Dehydration Unit

20

Get a Quick Quote >

5000 m³ Natural Gas Dehydration Unit, Dew Point ≤ -40°C, Four-Level Explosion-Proof, Molecular Sieve Adsorption Dehydration Equipment Overview

The Yipu natural gas dehydration unit adopts molecular sieve temperature swing adsorption technology and operates continuously in an alternating dual-tower mode, with a processing capacity of 210Nm³/h and an operating pressure of 0.6~0.8MPa. The atmospheric pressure dew point at the outlet is ≤-40℃, meeting the deep dehydration requirements of coalbed methane and natural gas gathering and transportation in Shanxi. The unit is fully skid-mounted and integrated, equipped with PLC semi-automatic control, explosion-proof electric heater, explosion-proof booster and automatic liquid drainage system. The explosion-proof rating is ExdIIBT4, the total power is ≤20kW, and the molecular sieve service life is ≥20000h. It features intelligent control, safe explosion protection, compact footprint and low energy consumption, and is suitable for scenarios such as gas gathering stations, coalbed methane processing centers and CNG filling stations.

Professional 5000 m³ Natural Gas Dehydration Unit, Dew Point ≤ -40°C, Four-Level Explosion-Proof, Molecular Sieve Adsorption Dehydration Equipment Company

17+
years of professional field experience
6+
product R&D experience
9+
intellectual property
20+
industry application cases

Deeply engaged in customized solutions for the natural gas dehydration industry

Industry Pain Points

Low-temperature ice blockage threatens pipeline safety
Low-temperature ice blockage threatens pipeline safety
In winter, temperatures in Shanxi are low, and moisture in natural gas easily forms hydrates that block pipelines
valves and instruments, causing gas transmission interruptions and affecting the normal outward transmission of the gas field.
Acidic corrosion shortens equipment service life
Acidic corrosion shortens equipment service life
Moisture combines with acidic components such as CO₂ to form acidic solutions
corroding pipelines, compressors, and pressure regulating valves, increasing maintenance costs and affecting the long-term stable operation of the system.
Non-compliant gas quality affects outward transmission metering
Non-compliant gas quality affects outward transmission metering
Excessive moisture reduces the calorific value of natural gas and the accuracy of metering
making it difficult to meet the GB17820 gas quality indicators, creating obstacles for trade settlement and pipeline access.
Traditional dehydration has high energy consumption and large losses
Traditional dehydration has high energy consumption and large losses
The open regeneration process results in large natural gas venting losses and relatively high operating energy consumption
Small and medium-sized gas fields and gas gathering stations urgently need dehydration solutions with low energy consumption and low loss.

Solutions

ProblemSolutions
In the low-temperature winter environment of Shanxi, natural gas pipelines are prone to ice blockage, causing gas transmission interruptionUsing the Yipu natural gas dehydration unit, the outlet atmospheric dew point is reduced to ≤-40℃, removing moisture from the source and effectively preventing hydrate formation
Moisture combines with acidic components such as CO₂ to form acidic solutions, corroding pipelines and compressorsThrough deep dehydration with molecular sieves, the conditions for acidic solution formation are reduced, and with anti-corrosion material pipelines and regular maintenance, the service life of the equipment is extended
Excessive moisture in natural gas leads to inaccurate heating value and metering, affecting trade settlementUsing the Yipu natural gas dehydration unit to stably control the dew point at ≤-40℃, ensuring that the gas quality meets the GB17820 index requirements and safeguarding metering accuracy
The traditional open regeneration process has large natural gas venting losses and high operating costsUsing the isobaric semi-open countercurrent regeneration process, the regenerated natural gas is cooled, separated, and returned to the inlet for recycling, reducing gas loss
Small and medium-sized gas fields and gas gathering stations have limited space, and equipment installation takes a long timeThe skid-mounted Yipu natural gas dehydration unit is selected, with overall dimensions of approximately 3000×1600×2500mm; on site, only flange connection and power wiring are required
Operators have limited technical skills and find it difficult to master complex dehydration processesThe unit adopts PLC semi-automatic control and is equipped with a Siemens touch screen human-machine interface for intuitive and simple operation. The supplier is responsible for training until personnel understand the principles and can operate the equipment
Frequent molecular sieve replacement and high maintenance costsYipu custom molecular sieve is designed with a service life of ≥20000h, combined with a pre-separation filter and a post dust filter to intercept impurities and extend the replacement cycle
Fixed regeneration cycle cannot adapt to gas source fluctuationsThe regeneration cycle is ≤10h and adjustable, and can be flexibly set according to actual working conditions to meet dehydration needs under different gas source conditions
There are safety hazards when the equipment operates in explosive atmospheresThe whole unit has explosion-proof rating ExdIIBT4, and key components such as explosion-proof electric heaters, explosion-proof boosters, and explosion-proof control cabinets are all configured according to explosion-proof standards
Slow after-sales response after equipment failure, affecting continuous productionThe supplier promises to propose a solution within 8 hours, dispatch personnel to the site within 24 hours, and supply spare parts at stable prices within three years

Core Advantages

deep dehydration

Dew point reaches minus 40 degrees

Meets stringent gas quality requirements

deep dehydration

safe explosion protection

High explosion-proof rating for the entire unit

Stable operation in explosive environments

safe explosion protection

Intelligent control

PLC semi-automatic control

Intuitive touchscreen operation

Intelligent control

Compact skid-mounted design

Fully skid-mounted, small footprint

Short on-site installation period

Compact skid-mounted design

Technical Principle

Temperature swing adsorption dehydration

Molecular sieve adsorbs moisture at low temperature and high pressure

desorbed and regenerated after heating, Achieves deep dehydration

Temperature swing adsorption dehydration

Dual-tower alternating switching

A、 Tower B alternates between adsorption and regeneration

Ensures continuous, uninterrupted operation of the unit

Dual-tower alternating switching

Isobaric countercurrent regeneration

Regeneration gas flows countercurrently through the bed

Heating desorbs moisture, cooled, separated and recycled

Isobaric countercurrent regeneration

Skid-mounted integrated control

PLC semi-automatic control of the entire process

Explosion-proof design integrated into the overall skid-mounted base

Skid-mounted integrated control

Technical Strength

Multiple patents and software copyrights

Multiple patents and software copyrights

as well as 12 software copyrights including the natural gas dehydration unit control system, solid technical reserves
Industry-University-Research Collaborative Innovation

Industry-University-Research Collaborative Innovation

Carry out scientific research cooperation,

and occupational health and safety management system certification, product quality is guaranteed
Long-term supplier to well-known enterprises

Long-term supplier to well-known enterprises

long-term supplier to enterprises such as Zhejiang Energy Group, high market recognition
Products exported overseas

Products exported overseas

to multiple countries, with international delivery and service capabilities
Self-developed dedicated control system

Self-developed dedicated control system

PLC source code provided after warranty delivery,with mature and reliable control logic.

Process Flow

The Yipu natural gas dehydration unit adopts a dual-tower alternating operation mode to ensure continuous adsorption and regeneration without affecting the normal processing of the main gas stream. The entire unit is integrated on a single skid-mounted base, covering complete functional units such as separation and filtration, adsorption drying, regeneration heating, cooling and separation, and booster circulation.

Adsorption process: The raw natural gas first passes through a separation filter to remove trace liquids and solid particles entrained in the gas, and then enters Tower A, which is in the adsorption state. As the gas passes through the molecular sieve bed in Tower A, the molecular sieve selectively adsorbs moisture from the natural gas under low-temperature and high-pressure conditions. The dried gas after adsorption then undergoes deep purification through a dust filter and is finally output from the gas outlet, completing the entire adsorption drying process.

Regeneration process: When the molecular sieve in Tower A becomes saturated with water, the system switches to the regeneration process through valve operation. A small amount of natural gas within the system is pressurized by a booster and enters an explosion-proof electric heater, where it is heated to 180°C-200°C before entering the regeneration tower (at this time, Tower B is in the adsorption state and Tower A is undergoing regeneration). The high-temperature gas causes the moisture adsorbed in the molecular sieve to desorb. The desorbed natural gas with high water content enters an explosion-proof air-cooled cooler for temperature reduction, and then the condensed water is separated in a gas-liquid separator and discharged into a liquid storage tank. The separated natural gas returns to the inlet end and re-enters the adsorption tower to participate in drying, forming a closed-loop cycle until the molecular sieve in the tower is fully regenerated. The adsorption and regeneration of Towers A and B alternate to achieve continuous and uninterrupted natural gas dehydration operation.

Product Parameters

ParameterItem Technical Specification
WorkingMedium Natural Gas
ProcessingCapacity 210Nm³/h @0.8MPa
WorkingPressure 0.6~0.8MPa
DesignPressure 1.0MPa
InletTemperature ≤40℃
OutletTemperature ≤60℃
DehydrationMethod Adsorption Dehydration (Molecular Sieve)
WorkingMode Dual-tower alternating, continuous operation
RegenerationMethod Isobaric semi-open countercurrent regeneration
RegenerationTemperature 180~200℃
AtmosphericDew Point ≤-40℃
WorkingCycle 12h
RegenerationCycle ≤10h (adjustable)
EquipmentPressure Drop ≤40kPa
ControlMode PLC semi-automatic control
DrainageMethod Automatic drainage
Inlet/OutletPipe Diameter Flange WN40(A)-16RF
Explosion-proofGrade ExdIIBT4
EquipmentPower ≤20kW
PowerSupply AC380V/50Hz
StructuralForm Integral skid-mounted
Dimensions3000×1600×2500mm (reference)
MolecularSieve Service Life ≥20000h

Office Environment

1
1
2
3
4
5
6
7
8
9
10
11
12
14
16
17
18
19
20
1

Partner Clients

Some Customers

1
1
2
2
3
3
4
4
5
5
6
6
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
7
7
8
8
9
9
10
10
11
11
12
12

FAQ

The unit is designed for an outlet dew point at normal pressure of ≤-40°C, with the regeneration temperature controlled at 180°C-200°C, and the adsorbent bed temperature in the adsorption tower during desorption regeneration ≥160°C. Depending on actual operating conditions and gas source conditions, the dew point indicator can stably meet the design requirements.
The molecular sieve adsorbent selected by Yipu has a design service life of ≥20,000 hours. The actual replacement cycle depends on gas source cleanliness, regeneration effectiveness, and the level of operation and maintenance. The unit is equipped with a pre-separation filter and a post-dust filter that can effectively intercept impurities and molecular sieve dust, helping to extend the service life of the molecular sieve.
Yes, it can operate normally. The unit design takes environmental adaptability into account. The explosion-proof electric heater and heat tracing measures can ensure the normal operation of the regeneration system at low temperatures. For coalbed methane treatment scenarios in areas such as the Qinshui Basin in Shanxi, Yipu can provide targeted anti-freeze and insulation design recommendations.
The unit adopts an isobaric semi-open countercurrent regeneration process. After regeneration, the high-moisture natural gas is cooled and separated, then returned to the inlet end and enters the adsorption tower again for drying, forming a closed loop and effectively reducing gas venting losses. Compared with open regeneration processes, natural gas utilization is higher.
The overall equipment quality warranty period is 12 months (calculated from the date of acceptance). During the warranty period, for faults caused by the supplier's own reasons such as design, manufacturing, materials, and assembly, the supplier shall provide free repair and free replacement of parts. The supplier undertakes to propose a solution within 8 hours after receiving service information, and to arrive at the site within 24 hours when personnel dispatch is required. Prices for spare parts shall remain stable within three years.

Send Inquiry