| Problem | Solutions |
| Excessive water content in natural gas causes pipeline ice blockage and corrosion | Adopts dual-tower molecular sieve adsorption dehydration, outlet dew point ≤-60℃@0.1MPa, controlling moisture from the source |
| Replacing the entire unit during old equipment retrofit costs too much | Whole-unit skid-mounted structure, all pipe openings and cables connected to the skid edge, adapting to existing sites and reducing modification construction costs |
| Downstream gas supply pressure fluctuation during dual-tower switching | PLC automatically controls valve switching timing, combined with flat diffusion structure, output gas is stable without pressure fluctuation |
| Large natural gas venting loss during regeneration process | Isobaric semi-open countercurrent regeneration, regeneration pressure is approximately working pressure, high-humidity gas is cooled and separated then natural gas is reused |
| Unstable molecular sieve regeneration temperature control | Heater triple over-temperature protection, automatic power-off when temperature is too high, automatic power-on when temperature drops, maintaining 150~180℃ |
| Inlet gas carrying free water or heavy hydrocarbons contaminates molecular sieve | Pre-separation filter removes free oil, water and large particle impurities, protecting adsorbent and subsequent equipment |
| Molecular sieve replacement requires pipeline disassembly, time-consuming and labor-intensive | Adsorption tower is equipped with dedicated loading and unloading ports, molecular sieve can be replaced without disassembling pipelines |
| Equipment operation is limited in Xinjiang winter low-temperature environment | Electric heating regeneration is not affected by ambient temperature, pipelines can be equipped with insulation layers, explosion-proof rating ExdIBT4 adapts to the site |
| On-site operators have heavy inspection workload | PLC automatic control, automatic valve switching, regeneration heating and cooling proceed automatically without manual intervention |
| Equipment faults cannot be discovered and handled in time | Equipped with short-circuit and overload protection; automatically shuts down or stops regeneration in case of system abnormality; touch screen displays operating status |
Dew point down to minus 60 degrees
Meets strict requirements for liquefaction and pipeline transmission

Dual-tower alternating automatic switching operation
Stable output without pressure fluctuations

Isobaric regeneration reduces venting losses
Regeneration gas returned to the system after cooling

Triple over-temperature protection with automatic power-off
explosion-proof rating meets on-site requirements

utilizes the selective adsorption of polar water molecules by the uniform micropores of the molecular sieve
retains moisture in natural gas under low temperature and high pressure

single-tower regeneration and desorption
Automatic valve switching, achieves uninterrupted continuous gas supply

the regeneration gas is heated and then introduced countercurrently into the tower
causing the molecular sieve to desorb moisture, stable pressure, low gas loss

the high-humidity regeneration gas is condensed and separated by a cooler
liquid water is discharged, natural gas is returned to the front end of the system








| Parameter | Item Specification |
|---|---|
| Equipment | Model YNG7-6000-0.7~1.2-AM |
| Working | Medium Natural Gas |
| Processing | Capacity 6000Nm³/h@1.2MPa |
| Working | Pressure 0.7~1.2MPa |
| Design | Pressure 1.6MPa |
| Inlet | Temperature ≤25℃ |
| Outlet | Temperature Ambient Temperature+15℃ |
| Inlet | Water Content -13℃@0.8MPa |
| Outlet | Dew Point ≤-60℃@0.1MPa |
| Dehydration | Method Adsorption Dehydration (Molecular Sieve) |
| Working | Mode Dual-tower alternating, continuous operation |
| Regeneration | Mode Isobaric semi-open countercurrent regeneration |
| Regeneration | Temperature 150~180℃ |
| Cooling | Method Air Cooling |
| Equipment | Pressure Drop ≤50kPa |
| Working | Cycle 12h~24h |
| Regeneration | Cycle ≤10h (adjustable) |
| Inlet/Outlet | Pipe Diameter Flange WN150(B)-25RF |
| Explosion-proof | Grade ExdIBT4 |
| Equipment | Power ≤51kW |
| Power | Supply AC380V/50Hz |
| Structural | Form Complete Skid-mounted Unit |
| Overall | Dimensions Approx. 4500×2300×2830mm |



















Professional production team, with strict quality control implemented in every production process
Market pain points In the process of natural gas extraction, processing, and transportation, the pre...
MORE >I. Market Pain Points During oil and gas field development, oilfield wellhead gas often contains lar...
MORE >Market pain pointsAs a clean energy source, natural gas faces its greatest hidden risk during ...
MORE >I. Market Pain Points In the process of natural gas extraction, gathering and transportation, and CN...
MORE >Safe and Worry-Free In the process of biogas energy utilization, moisture removal is a key step to e...
MORE >I. Market Pain Points In the extraction, gathering and transportation, and filling station applicati...
MORE >Some Customers